Book now with code EOY2025
phoeneous wrote: » Cost is based on the receiving ports speed. Take the example below. If switch C is the root and if all ports on all switches are 100Mb then the cost from B to C is 19. The cost from A to C is also 19. Always remember, cost is calculated on the receiving port, not the sending port! These are the common port costs: 10Mb = 100 100Mb = 19 1000Mb = 4 10000Mb = 2
Use code EOY2025 to receive $250 off your 2025 certification boot camp!