Forsaken_GA wrote: » The thing to remember about BB1 and the Frame Relay Switch is that they're physically one device, but logically, they're two. I'm using a 2620 with an NM-8A/S in this role. My first six connections (2 of them are going to R3) are to R1 through R5, and they're setup to do frame relay switching. The seventh connection is going to R6 for the multiple pvc's, and the eighth connection is going to BB3. The config Brian pointed me to -http://www.ine.com/downloads/bb1.txt Works perfectly for this, I just had to modify the interface names to fit with my hardware
TheShadow wrote: » Sorry I did not explain better but Forsaken has given you the answer. I guess I never thought about it being confusing when you look at the config charts at the bottom of the page. BB1 is the only device capable of a cloud that size and the physical hardware does not include an extra router. They used to have a 3640 at one time doing frame and terminal services besides routing when they would advise people on lab equipment.
TheShadow wrote: » Sorry I did not explain better but Forsaken has given you the answer. I guess I never thought about it being confusing when you look at the config charts at the bottom of the page. BB1 is the only device capable of a cloud that size and the physical hardware does not include an extra router. They used to have a 3640 at one time doing frame and terminal services besides routing when they would advise people on lab equipment. Playing with Juniper too much lately and a little mind warp occurs. Just what I need more brain ticks. Sorry again I will try to do better next time. I don't know about selling off the WIC-2T, they can be difficult to find at times on ebay. I have had bad luck in the past with them getting flaky when moving cables. However INE says you will never need to re-cable with their labs.