SWITCH – Another Lab Q
I'm looking to brush up on my switching skills and take a little break from voice at the same time – What's the ideal lab topology for the SWITCH test? I currently have 2x 3560s, 1x 2950 (left over from CCNA) and an NME-16ES-1G-P. Since the NME is running a full 3750 IOS, would it be ok to use as the 4th switch?
CCNP:Collaboration, CCNP:R&S, CCNA:S, CCNA:V, CCNA, CCENT
Comments
-
peanutnoggin Member Posts: 1,096 ■■■□□□□□□□Pitviper,
What you have sounds great. Since you already have the 3560s, you will be able to do the private vlan stuff. I think you are okay... I'm currently studying the BCMSN/SWITCH material and I have 2 3550s and 2 2950s. HTH.
-PeanutWe cannot have a superior democracy with an inferior education system!
-Mayor Cory Booker -
pitviper Member Posts: 1,376 ■■■■■■■□□□Cool - Thanks for the input! I going to snag a book this weekend so that I can start playing.CCNP:Collaboration, CCNP:R&S, CCNA:S, CCNA:V, CCNA, CCENT
-
pitviper Member Posts: 1,376 ■■■■■■■□□□Any of you guys using an access server by any chance?
I'm using an NM-32A in a 3640 - Works great. Had a 2509-RJ prior to that.CCNP:Collaboration, CCNP:R&S, CCNA:S, CCNA:V, CCNA, CCENT -
notgoing2fail Member Posts: 1,138I'm using a 2511. I skipped the 2509 because I knew I was going to run out of console ports so I wanted to have 16 to be prepared.
Suffice it to say, now 16 isn't enough either... -
burbankmarc Member Posts: 460notgoing2fail wrote: »I'm using a 2511. I skipped the 2509 because I knew I was going to run out of console ports so I wanted to have 16 to be prepared.
Suffice it to say, now 16 isn't enough either...
Do you have any 3640's? If not I'd recommend them. They can do pretty much everything. You can get a module that will support 32 console connections.