Hello all.
Not really CCENT/CCNA related, but at one point or another, we'll have to run some cabling (if we havent already), right?

I will be going out to a branch in a few weeks to re-do their cabling. Currently, they have a 72 port patch panel, going to a 16 port D-Link switch (some of the cables are going directly from a server to the switch, etc). They'll be replacing that with a Cisco SF-300 48-port managed switch. How would you recommend I run the cables from the patch to the managed switch once it's mounted? I'm thinking maybe from the patch panel, down the inside of the rack on the sides, and to the switch.
Here are pics of their current setup:
Thanks!!!