Book now with code EOY2025
cisco_trooper wrote: » A cloud in a drawing generally indicates you don't know what the devices inside the cloud look like. In this drawing there is likely a single frame relay switch inside the cloud that is being used to provide the virtual circuits between the individual routers. The dotted lines do represent virtual circuits.
advanex1 wrote: » It looks like you actually have it wrong. There should be one central cloud that all 3 routers connect to and R1 is the hub with DLCI 102 and 103. What the dotted lines are expressing is the virtual circuits between routers, but they are all only going through one cloud and are in the same subnet from what I can see. So what you'd actually have is... R2 S0/0 is DLCI 101 (because they are only locally significant) | | R1 <cloud> R1 would have DLCI 102 going to R2 and DLCI 103 going to R3 through the FR network. | | R3 S0/0 DLCI is 101 for the same reason I hope that doesn't confuse you.
Use code EOY2025 to receive $250 off your 2025 certification boot camp!