Compare cert salaries and plan your next career move
themagicone wrote: » I spent my week working with an AV crew at UWEC (University of Wisconsin Eau Claire). They are building a new student center there. The amount of money wasted in that building is mind blowing. There is 2 IDF's on each floor, 3 floors for a total of 6 rooms. Each room has anywhere from 300 to 500+ drops, upwards of 25,000 to 40,000 feet of Cat6 Plenum Cable. They put drops EVERYWHERE. Every single electrical outlet has 2 data ports next to it, sometimes more. One spot that is in a hallway that has a display case that is 8 feet long has 2 ports on the bottom of the case, 2 on the left and 2 on the right. Then there is 2 just a few more feet down! Each room is getting at least 2 electronic scheduling screen on the outside, sometimes more. There is a AV rack in every conference room, projector, automated screen and sound system. The AV equipment for the 3rd floor that has a large ball room and 2 smaller meeting spaces uses 6 42U racks in itself. 50+ cameras. It is just amazing seeing it all. One of the biggest wastes of tax payer money and tuition I have ever seen.
themagicone wrote: » I don't have a problem with them building a new building. My scuff is with all the extra stuff. Do you really need 25 ports on a small hallway that will never be used? More so when you are installing a $100k cisco wireless network?
Compare salaries for top cybersecurity certifications. Free download for TechExams community.