Got some extra money at the end of the year, decided to go ahead and build out my rack in preparation for the CCIE.
Picture be
here
1 x 3640 w/ NM-2E2W + WIC-1T
1 x 3640 w/ NM-2E2W + NM-4T
1 x 3640 w/ NM-1E2W + WIC-1T + NM-1FE-TX
1 x 2611XM w/ NM-4A/S
1 x 2610XM w/ NM-4A/S
1 x 2610XM w/ 2 WIC-1T
2x 3550-24PWR
1 x 3550-48
1 x 3550-24
1 x 2620 w/ NM-8A/S
2 x 2501
1 x AS2511-RJ
It pains me not to have proper cable management, but I did the best I could with the limited space I have. Maybe when I move in about a year or so I can make it look prettier. Still a little bit of work I need to do (need a couple AUI's for the 2501's, had to plug the cat5 into the aux ports so I could get an idea of what my cable runs would look like), and I may change out a pair of 3550's for 3560's next year if cash flow allows it (otherwise I'll end up renting some rack time to be able to play with 3560 features when I need to).
It's built to the INE rack standard as much as possible (substituted 3640's for the 1841's, repurposed a 2620 as the BB1/Frame Relay switch since it was cheaper to buy the NM-8A/S than a 2522) and obviously 2 more 3550's in place of 3560's.
All told, it ended up costing me just over $2k, including cables, shipping, etc.
Now I have to figure out what to do with all the old crap that this stuff replaced!