well, finally got it cabled up, although all cable management is not complete yet.
Lab Details:
1x1900 (Breakout Switch)
1x2509 (Term Server)
4x3550 (Layer 3 switches w/EMI image)
1x GNS3/Dynamips Server (running 9 router instances) with following specs:
Intel Q9550 Quad Core, 4 gig ddr3 RAM, MSI X48C Platinum Mobo, 3x Adaptec Quad port NIC's
Shooting to schedule the lab exam sometime in May. Every time I think of scheduling the exam I get psyched out and motivated to where I want to study 24x7. Can't get enough of this stuff, I need MOAR!!
I'll keep you all posted...