Compare cert salaries and plan your next career move
Bellman80 wrote: » I thought it was always the sending station that does the jamming signal. The 100m max segment length and frame size has to do with being able to detect a collision and send a jamming signal while the frame is still leaving an interface.
EdTheLad wrote: » So you are looking at a half-duplex setup, lets say 10BaseT or 100BaseT. 2 devices connected back to back A and D, with twisted pair. The cat5 cable between uses 2 pairs for transmit and 2 pairs for receive. Wires 1,2 are transmit, wires 3,6 are receive in respect to A, the jamming signal from D cant collide with whats being sent from A as its on a different wire .
EdTheLad wrote: » With coax, there are still two cables, tx and rx, so it's exactly the same behavior as copper.
Compare salaries for top cybersecurity certifications. Free download for TechExams community.