CCNP Log: You touch Route and Switch, you Gonna End up with Trouble

BloodSweatPingsBloodSweatPings Posts: 27Member ■□□□□□□□□□
Time to take it up a Notch: Route First, Then Switch, the troubleshoot
Route topics are no that new to me so i am going to breeze through them, still giving my self enough time

First Deadline : 22/02/14 - Route




Comments

  • BloodSweatPingsBloodSweatPings Posts: 27Member ■□□□□□□□□□
    This Week, I aim to finish Eigrp Fully : Blue print for CCNP R&S


    Implement an EIGRP based solution, given a network design and a set of requirements
    • Determine network resources needed for implementing EIGRP in a network
    • Create an EIGRP implementation plan
    • Create an EIGRP verification plan
    • Configure EIGRP routing
    • Verify an EIGRP solution was implemented properly using show and debug commands
    • Document the verification results for an EIGRP implementation
Sign In or Register to comment.