CCNP Log: You touch Route and Switch, you Gonna End up with Trouble
BloodSweatPings
Member Posts: 27 ■□□□□□□□□□
in CCNP
Time to take it up a Notch: Route First, Then Switch, the troubleshoot
Route topics are no that new to me so i am going to breeze through them, still giving my self enough time
First Deadline : 22/02/14 - Route
Route topics are no that new to me so i am going to breeze through them, still giving my self enough time
First Deadline : 22/02/14 - Route
Comments
-
BloodSweatPings Member Posts: 27 ■□□□□□□□□□This Week, I aim to finish Eigrp Fully : Blue print for CCNP R&S
Implement an EIGRP based solution, given a network design and a set of requirements- Determine network resources needed for implementing EIGRP in a network
- Create an EIGRP implementation plan
- Create an EIGRP verification plan
- Configure EIGRP routing
- Verify an EIGRP solution was implemented properly using show and debug commands
- Document the verification results for an EIGRP implementation