Passed 70-412!!!

Sat for the 412 today. Felt pretty confident going through the exam. Got 790/1000.
Used CBT Nuggets and Pluralsight videos.
Just to reassure everyone even though the R2 material was confirmed for the 28th, I did not see any R2 material. Now I can sport that MCSA title!
Used CBT Nuggets and Pluralsight videos.
Just to reassure everyone even though the R2 material was confirmed for the 28th, I did not see any R2 material. Now I can sport that MCSA title!
Next Goal: Office 365 70-346 (Scheduled for 9/25)
Comments
How long did it take you to complete all three exams? Did you have any work experience?
Route[X], Switch [], TSHOOT[]
I have the basic helpdesk/junior admin experience (Configuring objects in AD, Creating mailboxes, very light ADSI Edit experience, DHCP and DNS experience, Checking Share permissions for network resources, configuring network printing, checking Event Viewer, Basic Hyper V stuff).
It took me about 6 months to finish all 3 exams. It could've been quicker if I wasn't so busy with other things. I think these can easily be done within 90 days.
Route[X], Switch [], TSHOOT[]
With the 70-413 it focuses less on setting up and configuring single features and more of designing company wide strategies and solutions.
"Everything is energy and that's all there is to it. Match the frequency of the reality you want and you cannot help but get that reality. It can be no other way. This is not philosophy. This is physics." Albert Einstein.
2019 Goals: [ICND1][ICDN2]-CCNA
Ah thanks, why does it matter to do it before April? I probably wont finish my MCSA till about May, can I still do 413/414 after?